Bartlett House Demolition
Bartlett House, a federally owned property situated dangerously close to an eroding ocean bluff, is known locally as the birthplace of the ‘Watergate’ Scandal. Apex was contracted to perform turn key environmental, demolition, and site restoration services for the site.
Acting as the General Contractor, Apex was responsible for Geotechnical Engineering of the bluff, Asbestos, lead, and PCB identification / sampling / removal, site security and erosion controls, structural demolition, backfill, and emergency slope stabilization.
This project was also unique in that coordination with an onsite archeologist was required.
Special care was taken to prevent impact to the habitats of rare bird species that reside nearby.