Potter Station Power Plant Asbestos Abatement Project
Apex performed asbestos abatement of exterior corrugated siding on a Air-Chilled Condenser Unit at BELD Power Station.
Due to the height of the structure, Apex utilized man-lifts and telehandlers to safely remove and transport the material to ground level, within an exterior regulated area.
Working at height in the highly sensitive environment of an active power plant was the perfect opportunity for Apex to showcase our commitment to safety and attention to detail.